Instrument landing system
Instrument landing system for radio navigation
HSN 8526 91 20 (Instrument landing system) is subject to mandatory type-approval certification under the Mandatory Testing and Certification of Telecom Equipment (MTCTE) scheme, administered by the Department of Telecommunications (DoT) and the Telecommunications Engineering Centre (TEC), pursuant to the Indian Telegraph (Amendment) Rules, 2017. Compliance with TEC notifications — including F.No.5-2/2024-TC/TEC (Pt.1) dated 25-02-2025 — is required before the consignment may be cleared at the bill of entry.
- MTCTE Type Approval Certificate from TEC
- Compliance declaration from DoT
- Import documentation from CBIC
- 1Obtain a valid MTCTE Type Approval Certificate from the Telecommunications Engineering Centre before the consignment is shipped. The instrument landing system must appear on the list of telecom products notified under MTCTE per TEC Notification F.No.5-2/2024-TC/TEC (Pt.1) dated 25-02-2025, which is the current operative amendment.Indian Telegraph (Amendment) Rules, 2017 · TEC Notification F.No.5-2/2024-TC/TEC (Pt.1) dated 25-02-2025
- 2Verify that the product model and manufacturer are registered under the MTCTE scheme as amended by TEC/01/2017-TC dated 04-07-2019, TEC notification dated 23-06-2020, and F.No.5-2/2021-TC/TEC/131 dated 13-06-2022. Upload the Type Approval Certificate in e-Sanchit prior to filing the bill of entry to avoid consignment detention.TEC/01/2017-TC dated 04-07-2019 · TEC notification dated 23-06-2020 · F.No.5-2/2021-TC/TEC/131 dated 13-06-2022
The most common error on this tariff line is presenting a Type Approval Certificate obtained under an earlier MTCTE notification without verifying that the certificate remains valid under the latest amendment. The MTCTE notified product list has been amended multiple times — most recently by F.No.5-2/2024-TC/TEC (Pt.1) dated 25-02-2025 — and a certificate referencing a superseded notification version may be rejected at the bill of entry, triggering detention and demurrage until a current TEC approval is produced.