Electric sound amplifier sets
Electric sound amplifier sets for audio applications
HSN 8518 50 00 (electric sound amplifier sets) is covered by a Bureau of Indian Standards Quality Control Order. Conformity to IS 13252 (Part 1):2010 or IS 616:2017, with transition to IS/IEC 62368 (Part 1):2023 under a concurrent-running window, is mandatory under the Compulsory Registration Scheme with effect from 18 March 2021. Extended Producer Responsibility authorisation administered by the Central Pollution Control Board applies as a separate customs-clearance overlay.
Procedural directions for customs clearance are issued by: Central Board of Indirect Taxes and Customs, Directorate General of Foreign Trade.
- 1Verify the foreign supplier's BIS Compulsory Registration Scheme R-number on the BIS portal against IS 13252 (Part 1):2010, IS 616:2017, or IS/IEC 62368 (Part 1):2023 as applicable to the product model. The R-number must be model-specific and current on the shipping bill date.Electronics and Information Technology Goods (Requirement of Compulsory Registration) Order, 2021 · S.O. 1248(E) dated 18-03-2021 · S.O. 4997(E) dated 29-10-2025
- 2Confirm the applicable standard: amplifiers with input power 2000 W and above must conform to IS/IEC 62368 (Part 1):2023 under Scheme-II of Schedule-II of the BIS (Conformity Assessment) Regulations, 2018. For lower-power units, IS 13252 (Part 1):2010 and IS 616:2017 remain valid during the concurrent-running window.S.O. 4997(E) dated 29-10-2025 · General Note 2(c) of the ITC (HS) Import Policy
- 3Note the concurrent-running deadlines: for goods at serial no. 65 of the QCO schedule, IS 13252 (Part 1):2010 and IS 616:2017 run concurrently with IS/IEC 62368 (Part 1):2023 until 01-05-2026; for all other notified goods, the concurrent window extends until 01-11-2028, after which IS 13252 (Part 1):2010 and IS 616:2017 stand withdrawn.S.O. 4997(E) dated 29-10-2025 · General Note 2(c) of the ITC (HS) Import Policy
- 4Obtain Extended Producer Responsibility authorisation from the Central Pollution Control Board before import. MSMED-registered micro enterprises are exempt. Quote the EPR authorisation number on the bill of entry alongside the BIS R-number.Schedule-I of the E-Waste (Management) Rules, 2022 · G.S.R. 801(E) dated 02-11-2022
- 5Verify whether the amplifier unit also falls within the Mandatory Testing and Certification of Telecom Equipment (MTCTE) scope under the Indian Telegraph (Amendment) Rules, 2017. Quote the BIS R-number and any applicable MTCTE certification on the bill of entry; customs and DoT verify these independently.Indian Telegraph (Amendment) Rules, 2017 · DoT Notification F.No.5-2/2024-TC/TEC (Pt.1) dated 25-02-2025 · DGFT Notification 13/24-25 dated 20-05-2024
The most common error on this tariff line is registering the product under the wrong Indian Standard for the power rating: importers apply for a CRS R-number against IS 13252 (Part 1):2010 without checking whether the unit's input power meets or exceeds 2000 W, which mandates IS/IEC 62368 (Part 1):2023 exclusively. A CRS R-number issued against a superseded standard for an out-of-scope power class is treated as no R-number at all at port, triggering detention. Verify the amplifier's rated input power against the 2000 W threshold before applying for BIS registration.