Skip to main content
Access IndiaPLATFORM
HomeHSNChapter 84HSN 8473 21 00

Of the electronic calculating machines of sub-heading 8470 10, 8470 21 or 8471 29

Parts and accessories for electronic calculating machines

CPCB CLEARANCE

HSN 8473 21 00 (parts and accessories for electronic calculating machines under sub-headings 8470 10, 8470 21 or 8471 29) is subject to Extended Producer Responsibility (EPR) authorisation administered by the Central Pollution Control Board (CPCB) under Schedule I of the E-Waste (Management) Rules, 2022. Department of Telecommunications mandatory type-approval under the Mandatory Testing and Certification of Telecom Equipment (MTCTE) scheme applies as an additional clearance requirement where the imported part constitutes a notified telecom product.

What this is
HSN code
8473 21 00
Chapter
84 · Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof
Primary regulator
CPCB · E-Waste (Management) Rules, 2022 (Schedule I EPR authorisation)
Customs documentation
  • EPR authorisation from CPCB
  • MTCTE type-approval certificate from DoT
  • Schedule I compliance declaration from CPCB
Applicable Partner Government Agencies
CPCBCPCB·Central Pollution Control Board
Compliance steps
  1. 1
    Obtain Extended Producer Responsibility authorisation from the Central Pollution Control Board before importing user terminal equipment or systems that fall within Schedule I of the E-Waste (Management) Rules, 2022. Note that EPR authorisation is not required for micro-enterprises as defined under the MSME Development Act, 2006.
    E-Waste (Management) Rules, 2022, Schedule I · G.S.R. 801(E) dated 02-11-2022
  2. 2
    Verify whether the specific part or accessory is listed under the Mandatory Testing and Certification of Telecom Equipment (MTCTE) scheme. If notified, a valid type-approval certificate from the Telecommunications Engineering Centre must be obtained before clearance, per the Indian Telegraph (Amendment) Rules, 2017 and DoT notifications TEC/01/2017-TC dated 04-07-2019 and 23-06-2020, as amended by F.No.5-2/2021-TC/TEC/131 dated 13-06-2022 and F.No.5-2/2024-TC/TEC(Pt.1) dated 25-02-2025.
    Indian Telegraph (Amendment) Rules, 2017 · DoT Notification TEC/01/2017-TC dated 04-07-2019 · F.No.5-2/2021-TC/TEC/131 dated 13-06-2022 · F.No.5-2/2024-TC/TEC(Pt.1) dated 25-02-2025
A word of counsel

The single most common error on this tariff line is assuming that parts and accessories for calculating machines fall outside the MTCTE scope because the finished parent machine may not itself require DoT certification. Each notified telecom-capable component — including display modules, wireless interface cards, or power modules that contain radio or telecom functionality — must be independently assessed against the current MTCTE notified-product list; the DoT notified-product list has been amended multiple times and importers must verify against the 25 February 2025 update before dispatch.

Need a regulatory steer on this product?
Speak to a regulatory counsel about your specific HSN, IS, and supplier situation.
Speak to an Expert
Frequently asked
Does HSN 8473 21 00 require BIS certification?
No, no BIS Quality Control Order covers parts and accessories for electronic calculating machines under this tariff line. Import is governed by Central Pollution Control Board EPR authorisation under Schedule I of the E-Waste (Management) Rules, 2022, with a potential MTCTE type-approval overlay for notified telecom components.
Does the EPR authorisation requirement apply to all importers of this HSN?
No. EPR authorisation under the E-Waste (Management) Rules, 2022 does not apply to micro-enterprises as defined in the MSME Development Act, 2006; all other importers of user terminal equipment or systems within Schedule I must hold a current CPCB EPR authorisation at the time of bill of entry.
How do I determine whether a specific part under this HSN triggers MTCTE mandatory certification?
Cross-reference the component against the current MTCTE notified-product list, last amended vide F.No.5-2/2024-TC/TEC(Pt.1) dated 25-02-2025; components with any telecom or radio interface function are most likely to be listed, and importing a notified product without a valid type-approval certificate is an Indian Telegraph Act contravention.
Last verified against gazette notifications: 2026-05-16. Source: CPCB / Indian Customs CUSDATA.