Plant growth chambers and rooms and tissue culture chambers and rooms having temperature, humidity or light control
Plant growth chambers and tissue culture rooms with climate control
HSN 8419 89 60 (Plant growth chambers and rooms and tissue culture chambers and rooms) is subject to Petroleum and Explosives Safety Organisation (PESO) approval under the Gas Cylinders Rules, 2016, insofar as the equipment incorporates pressure vessels or gas-handling components within scope. Central Board of Indirect Taxes and Customs (CBIC) Instruction 12/2021-Cus dated 25-05-2021 sets out the clearance procedure applicable at the bill-of-entry stage.
- Import approval from PESO
- Third-party inspection certificate from manufacturer
- Hydro test certificate from manufacturer
Procedural directions for customs clearance are issued by: Central Board of Indirect Taxes and Customs.
- 1Apply for PESO import approval through the PESO online system before shipment. The application must include the manufacturer's particulars, ISO certificate of the manufacturer, list of cylinders or pressure vessels with specifications, drawings and batch numbers, hydro test certificate, and a third-party inspection certificate.Press Release dated 15-05-2021, Release ID 1718815, Ministry of Commerce and Industry · Gas Cylinders Rules, 2016
- 2Upload the PESO approval and supporting documents — including the hydro test certificate and third-party inspection certificate — in e-Sanchit before filing the bill of entry. Confirm that the PESO online application reference is available for customs verification prior to out-of-charge.CBIC Instruction 12/2021-Cus dated 25-05-2021
The most common error on this tariff line is assuming that plant growth chambers and tissue culture rooms — which control temperature, humidity, and light — fall entirely outside PESO scope simply because they are laboratory equipment. Where such chambers incorporate gas cylinders or pressure vessels (e.g., CO₂ enrichment systems), PESO approval under the Gas Cylinders Rules, 2016 is triggered; importers who omit the PESO online application face consignment detention at port until the approval is obtained.