Commercial type

Commercial combined refrigerator-freezers with separate external doors

BEE CLEARANCE · CPCB CLEARANCE · +2 OTHER PGAS

HSN 8418 10 10 (commercial-type combined refrigerator-freezers) is subject to Bureau of Energy Efficiency (BEE) appliance labelling and compliance requirements under the Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026. Central Pollution Control Board (CPCB) Extended Producer Responsibility (EPR) authorisation under Schedule I of the E-Waste (Management) Rules, 2022, and an ODS-linked import licence from the Directorate General of Foreign Trade (DGFT) under Rule 10 of the Ozone Depleting Substances Rules, 2000, apply as concurrent clearance requirements. Petroleum and Explosives Safety Organisation (PESO) approval is required where the equipment incorporates pressure vessels or cylinders.

What this is
HSN code
8418 10 10
Chapter
84 · Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof
Primary regulator
BEE · Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026
Customs documentation
  • Appliance compliance label from BEE
  • EPR authorisation from CPCB
  • ODS licence from DGFT
Applicable Partner Government Agencies
BEEBEE·Bureau of Energy Efficiency
CPCBCPCB·Central Pollution Control Board
PESOPESO·Petroleum and Explosives Safety Organisation
MEFCCMEFCC·Ministry of Environment, Forest and Climate Change

Procedural directions for customs clearance are issued by: Directorate General of Foreign Trade, Central Board of Indirect Taxes and Customs.

Compliance steps
  1. 1
    Confirm the consignment carries the mandatory BEE star-rating label and complies with the Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026 before filing the bill of entry. Non-compliant equipment is liable to detention and out-of-charge refusal at the port.
    BEE Notification No. 5506/BEE/S&L/AL/2025-26 dated 26-12-2025
  2. 2
    Obtain Extended Producer Responsibility authorisation from the Central Pollution Control Board and ensure it is current at the time of import. EPR authorisation is required for all importers of refrigerating equipment listed under Schedule I of the E-Waste (Management) Rules, 2022, except micro-enterprises as defined under the MSME Development Act, 2006.
    E-Waste (Management) Rules, 2022 · G.S.R. 801(E) dated 02-11-2022
  3. 3
    Where the equipment contains or is designed for ozone-depleting substances listed in Schedule VII of the ODS Rules, obtain an ODS import licence from DGFT under General Note 8(A) of the Import Policy; if the equipment is ODS-free, affix the prescribed label confirming the absence of ODS before import. Separately, where the equipment incorporates cylinders or pressure vessels, apply for PESO approval through the PESO online system before import.
    Rule 10 of the Ozone Depleting Substances (ODS) Rules, 2000 · General Note 8(A) of Import Policy · CBIC Instruction 12/2021-Cus dated 25-05-2021
A word of counsel

The most common error on this tariff line is treating BEE labelling as the sole clearance requirement and overlooking the concurrent CPCB EPR authorisation obligation — which is not waived by BEE compliance. Importers who are not micro-enterprises under the MSME Development Act, 2006 must hold a valid EPR authorisation at the time of import; a missing or expired authorisation triggers detention independent of BEE label status, and a subsequent retrospective authorisation does not cure the violation at the bill-of-entry stage.

Need a regulatory steer on this product?
Speak to a regulatory counsel about your specific HSN, IS, and supplier situation.
Speak to an Expert
Frequently asked
Does HSN 8418 10 10 require BIS certification?
No, commercial combined refrigerator-freezers under this tariff line are not within the BIS Quality Control Order regime. Import is governed by the Bureau of Energy Efficiency under the Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026, with concurrent CPCB EPR authorisation and DGFT ODS licence obligations.
Does the EPR authorisation requirement apply to all importers of refrigerators under this HSN?
EPR authorisation under Schedule I of the E-Waste (Management) Rules, 2022 applies to all importers except micro-enterprises as defined under the MSME Development Act, 2006; qualifying micro-enterprises should retain documentary proof of their MSME status at the bill of entry.
When is PESO approval required for equipment under this tariff line?
PESO approval is required where the equipment incorporates cylinders or pressure vessels for storage or transportation of gases; applications must be submitted through the PESO online system, and CBIC Instruction 12/2021-Cus dated 25-05-2021 sets out the COVID-era relaxation framework that remains the reference procedure for such approvals.