Skip to main content
Access IndiaPLATFORM
HomeHSNChapter 84HSN 8413 50 10

Metering and dosing pumps

Reciprocating positive displacement metering and dosing pumps

BEE CLEARANCE

HSN 8413 50 10 (Metering and dosing pumps) is subject to Bureau of Energy Efficiency (BEE) appliance labelling and compliance requirements under the Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026, issued vide Notification No. 5506/BEE/S&L/AL/2025-26 dated 26-12-2025. Directorate General of Foreign Trade (DGFT) standard import policy conditions apply at the bill-of-entry stage.

What this is
HSN code
8413 50 10
Chapter
84 · Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof
Primary regulator
BEE · Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026
Customs documentation
  • Energy label from BEE
  • Compliance declaration from BEE
  • Import documentation from DGFT
Applicable Partner Government Agencies
BEEBEE·Bureau of Energy Efficiency
Compliance steps
  1. 1
    Ensure the metering and dosing pump bears an energy label and meets the compliance requirements prescribed under the Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026 before the bill of entry is filed. Non-compliant pumps are liable to detention at port pending regularisation.
    BEE Notification No. 5506/BEE/S&L/AL/2025-26 dated 26-12-2025
  2. 2
    Upload mandatory BEE compliance documentation in e-Sanchit at the bill of entry stage. Confirm that the energy label details correspond to the specific model and rating declared in the commercial invoice and packing list.
    Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026 · BEE Notification No. 5506/BEE/S&L/AL/2025-26 dated 26-12-2025
A word of counsel

The most common error on this tariff line is importing metering and dosing pumps without verifying that the specific model is captured within the scope of BEE Notification No. 5506/BEE/S&L/AL/2025-26; the Regulations were issued on 26 December 2025 and consignments shipped before that date but arriving after it may be assessed against the new regime. Confirm scope applicability and label compliance at the purchase-order stage, not at the bill-of-entry stage, to avoid detention and demurrage at port.

Need a regulatory steer on this product?
Speak to a regulatory counsel about your specific HSN, IS, and supplier situation.
Speak to an Expert
Frequently asked
Does HSN 8413 50 10 require BIS certification?
No, no BIS Quality Control Order covers metering and dosing pumps under this tariff line. Import is governed by the Bureau of Energy Efficiency under the Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026 vide Notification No. 5506/BEE/S&L/AL/2025-26 dated 26-12-2025.
Which BEE notification applies to metering and dosing pumps under HSN 8413 50 10?
BEE Notification No. 5506/BEE/S&L/AL/2025-26 dated 26 December 2025, issuing the Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026, is the operative instrument.
What happens if a consignment arrives without the required BEE energy label?
A consignment lacking the mandated BEE energy label and compliance documentation is liable to detention at the port of import, with demurrage and ground rent accruing until the deficiency is remedied or the goods are re-exported.
Last verified against gazette notifications: 2026-05-16. Source: BEE / Indian Customs CUSDATA.
Related